Products

LEO 50SWEm15-20-2.2L Submersible Sewage Pump

2.2 kW 1-phase 50 Hz sewage pump; model-specific dimensions and source-based hydraulic reference. Source conflicts flagged; supplied duty/version confirmation required.

LEO 50SWEm15-20-2.2L submersible sewage pump

Enclosed channel impeller for wastewater drainage and suitable sewage-transfer duties. Manufacturer photograph represents the 50SWE design family; exact motor-stack length and supplied accessories may vary.

Published technical specifications

Power2.2 kW / 3 HP
Phase / frequency / poles1-phase / 50 Hz / 2 poles; confirm voltage from supplied nameplate.
Nominal discharge50 mm; confirm elbow/coupling interface.
Rated duty, source tableQ=15 m³/h at H=20 m
Separate maximum flow / head, source table45 m³/h / 23 m
Maximum solids diameter, source table25 mm
Liquid temperature / pH0–40°C / pH 4–10
Immersion limit5 m European versus 10 m local sheet: unresolved, confirm supplied instructions and do not assume higher limit.
Cable reference10 m
Insulation / protectionClass F / IP68
Float switchNot promised as standard for this version.

Individual hydraulic reference and dimensions

50SWEm15-20-2.2L individual hydraulic reference and exact phase-specific dimensional drawing/table
Approximate graph readings (about ±0.3 m reading uncertainty), not certified test points. Original manufacturer outline with exact model/phase table dimensions, not packaging.
Approx. Q (m³/h)0.1246810121416182022242628303234363840424444.8
Approx. H (m)2322.622.221.821.52120.620.119.518.918.217.416.615.814.9141312.111108.97.76.66.1
L1268 mm
L2221 mm
L3112 mm
L4163 mm
H571 mm
H170 mm
D50 mm
D1110 mm
D214 mm
M16 mm

Source conflicts and installation checks

Manufacturer graph readings are approximate references (about ±0.3 m reading uncertainty), not certified test points or an acceptance tolerance. Published rated/max values remain separate; several graph/table envelope values differ. Maximum flow and head are separate limits, not one operating point. No extrapolated zero-head or shut-off endpoint is invented. Confirm supplied voltage, actual phase-specific height, cable, elbow/coupling, duty point and installation clearances. Do not substitute nominal discharge for the drawing dimension D.

View SWE range · Request a quotation and duty confirmation