LEO 80SWUm30-7-2.2L Submersible Sewage Pump

2.2 kW 1-phase 50 Hz sewage pump; individual hydraulic reference and exact product dimensions. Source discrepancies flagged; supplied duty/version confirmation required.

LEO 80SWUm30-7-2.2L submersible sewage pump

Semi-open vortex impeller for wastewater containing impurities and long-fibre substances. Manufacturer photograph represents the 80SWU design family; exact motor-stack length and supplied accessories may vary.

Published technical specifications

Power2.2 kW / 3 HP
Phase / frequency / poles1-phase / 50 Hz / 2 poles; confirm voltage from supplied nameplate.
Nominal discharge80 mm; confirm actual elbow/coupling.
Rated duty, source tableQ=30 m³/h at H=7 m
Separate maximum flow / head, source table45 m³/h / 8 m
Maximum solids diameter, source table76 mm
Liquid temperature / pH0–40°C / pH 4–10
Immersion limit5 m European versus 10 m local sheet: unresolved, confirm supplied instructions and do not assume higher limit.
Cable reference10 m
Insulation / protectionClass F / IP68
Float switchNot promised as standard for this version.

Individual hydraulic reference and dimensions

80SWUm30-7-2.2L individual hydraulic reference and phase-specific dimensional drawing/table
Approximate graph-derived reference (about ±0.3 m reading uncertainty), not certified test points. Original manufacturer product outline, exact model/phase dimension row, not packaging.
Approx. Q (m³/h)0.1246810121416182022242628303234363840424444.5
Approx. H (m)8.18.18.18.1887.97.87.87.77.67.57.47.27.16.96.86.66.46.265.85.55.4
L1260 mm
L2224 mm
L3118 mm
L4149 mm
H672 mm
H1122 mm
D75 mm
D1150 mm
D218 mm
M18 mm

Source conflicts and installation checks

The graphs and numerical ratings are separate manufacturer references, not independently certified duty data. Maximum flow and maximum head are separate limits, not one operating point. The individual curve uses approximate readings of the original orange stroke (about ±0.3 m reading uncertainty), not a fit through the rated/max table. Dimensions are source table values, not measured installation approval; confirm actual phase-specific height and the elbow/coupling interface. Nominal discharge must not be substituted for the drawing dimension D.

No extrapolated shut-off or zero-head endpoint has been invented. Confirm duty, voltage, operating immersion, actual phase, pipe interfaces and clearances before ordering.